OUR PROJECTS
We Build Projects That Last The Distance
From expansive highways to haul roads, we have successfully transformed blueprints into tangible pathways that connect communities and drive progress.
Explore our portfolio to witness the seamless blend of engineering expertise, cutting-edge technology, and unwavering commitment that defines Essjay Contracting's contribution to building the infrastructure that takes us into the future.
Civil Construction Projects
Fitzroy to Gladstone Pipeline
Description: This project comprises an approximately 117 kilometre pipeline, a water treatment plant, reservoirs and pumping stations connecting the Lower Fitzroy river to Gladstone Area Water Board’s existing water network at Yarwun. It will provide further water security for the Gladstone region in Queensland, and support for the emerging hydrogen industry in the area.
Location: Rockhampton & Gladstone, QLD
Client: McConnell Dowell – BMD Joint Venture (Gladstone Area Water Board)
Indicative Value of works: $983 million
Commencement Date: 2023
Completion Date: Late 2025-2026
Location: Rockhampton & Gladstone, QLD
Client: McConnell Dowell – BMD Joint Venture (Gladstone Area Water Board)
Indicative Value of works: $983 million
Commencement Date: 2023
Completion Date: Late 2025-2026
Walkerston Bypass
Description: The Walkerston Bypass will deliver a new 2-lane rural highway to connect Peak Downs Highway west of Walkerston to the Mackay Ring Road near Paget.
The Bypass will become the designated heavy vehicle route for B-double and other multi-combination vehicles, including A-double road trains, between the Bruce Highway and the Peak Downs Highway.
Location: Wakerston, QLD
Client: Fulton Hogan, PC to DTMR
Indicative Value of works: $149.28 million
Commencement Date: 2022
Completion Date: Mid-to-late 2024
The Bypass will become the designated heavy vehicle route for B-double and other multi-combination vehicles, including A-double road trains, between the Bruce Highway and the Peak Downs Highway.
Location: Wakerston, QLD
Client: Fulton Hogan, PC to DTMR
Indicative Value of works: $149.28 million
Commencement Date: 2022
Completion Date: Mid-to-late 2024
Tindal RAAF Base Redevelopment
Description: Currently, Essjay Contracting in conjunction with BMD is delivering works as part of the RAAF Base Tindal Redevelopment Stage 6 project. This project involves extending the existing runway, building a new air movements terminal, parking apron and extra fuel storage facilities.
Location: Tindal, Northern Territory
Client: BMD
Indicative Value of works: $737 million
Commencement Date: 2021
Completion Date: Mid-to-late 2024
Location: Tindal, Northern Territory
Client: BMD
Indicative Value of works: $737 million
Commencement Date: 2021
Completion Date: Mid-to-late 2024
Shoalwater Bay Military Training Area Upgrades
Description: This project involves constructing new and upgraded facilities and infrastructure at Shoalwater Bay military training area. This will support the training activities of the Australian Defence Force (ADF) and Singapore Armed Forces (SAF).
Location: Shoalwater Bay, QLD
Client: Shamrock Civil
Indicative Value of works: $211 million
Commencement Date: January 2019
Completion Date: Late 2022
Location: Shoalwater Bay, QLD
Client: Shamrock Civil
Indicative Value of works: $211 million
Commencement Date: January 2019
Completion Date: Late 2022
Peak Downs Highway – Safety Upgrades
Description: This project entails widening sections of the existing highway, upgrading intersections as well as addressing roadside hazards to improve the safety of this section of highway between Eton and Mackay. The highway is the principal freight corridor supplying the coal mines of northern Bowen basin. The route carries significant volumes of freight, including oversize and over-mass vehicles carrying large mining equipment, as well as local and commuter traffic.
Location: Mackay, QLD
Client: RoadTek (DTMR)
Indicative Value of works: $18 Million
Commencement Date: 2020
Completion Date: Late 2021
Location: Mackay, QLD
Client: RoadTek (DTMR)
Indicative Value of works: $18 Million
Commencement Date: 2020
Completion Date: Late 2021
Carmichael Mine Rail Network
Description: A 189km rail line connecting the Carmichael Mine to existing rail infrastructure at Goonyella and on to the North Queensland Export Terminals of Hay Point and Abbot Point.
Essjay Contracting supplied a full fleet of wet and dry hire machines and also ancillary equipment to this project.
Location: Belyando, QLD
Client: BMD Constructions & Martinus
Indicative Value of works: $1.5 billion
Commencement Date: 2020
Completion Date: Early 2022
Essjay Contracting supplied a full fleet of wet and dry hire machines and also ancillary equipment to this project.
Location: Belyando, QLD
Client: BMD Constructions & Martinus
Indicative Value of works: $1.5 billion
Commencement Date: 2020
Completion Date: Early 2022
Bruce Highway - Six Mile Creek to Gavial Creek Safety Upgrades
DESCRIPTION: This road works project involves over 12km of improvements to Queensland’s principal north-south Highway route, including road widening and overlay, and intersection upgrades. All works are being delivered under live traffic.
LOCATION: Bruce Highway, Rockhampton QLD
CLIENT: WBHO Infrastructure (DTMR)
INDICATIVE VALUE OF WORKS: $50 million
COMMENCEMENT DATE: June 2017
COMPLETION DATE: June 2018
LOCATION: Bruce Highway, Rockhampton QLD
CLIENT: WBHO Infrastructure (DTMR)
INDICATIVE VALUE OF WORKS: $50 million
COMMENCEMENT DATE: June 2017
COMPLETION DATE: June 2018
Bruce Highway – Haughton River Floodplain Upgrade
DESCRIPTION: This project involves the construction of a higher level bridge, road approaches, overpasses and the application of wide centre line treatments at the Haughton River on a new alignment.
Scope of works- Upgrading 13.5km of the Bruce Highway traversing the Haughton River floodplain;
Construction of an upgraded Haughton River bridge;
Wide centre line treatment works along the 13.5km section of highway;
Two new highway overpasses of the existing cane-tramway open-level crossings;
Upgrading nine rural intersections;
Realignment of a curve to improve safety.
LOCATION: Giru and Horseshoe Lagoon, North QLD
CLIENT: The Infrastructure Group (TIG)
INDICATIVE VALUE OF WORKS: $411.5 million
COMMENCEMENT DATE: April 2019
COMPLETION DATE: Mid 2021
Scope of works- Upgrading 13.5km of the Bruce Highway traversing the Haughton River floodplain;
Construction of an upgraded Haughton River bridge;
Wide centre line treatment works along the 13.5km section of highway;
Two new highway overpasses of the existing cane-tramway open-level crossings;
Upgrading nine rural intersections;
Realignment of a curve to improve safety.
LOCATION: Giru and Horseshoe Lagoon, North QLD
CLIENT: The Infrastructure Group (TIG)
INDICATIVE VALUE OF WORKS: $411.5 million
COMMENCEMENT DATE: April 2019
COMPLETION DATE: Mid 2021
Central Highlands Regional Council NDRRA works
DESCRIPTION: Essjay Contracting supplied and managed several crews comprising of graders, rollers, semi tanker and body water carts, loaders, excavators and side tippers, working throughout the Central Highlands Regional Council region assisting in the completion of NDRRA works.
LOCATION: Various roads throughout the Central Highlands Regional Council area - including Springsure, Rolleston, Emerald, Capella, Duaringa, Gem Fields, May Downs
CLIENT: Central Highlands Regional Council
COMMENCEMENT DATE: January 2019
COMPLETION DATE: August 2019
LOCATION: Various roads throughout the Central Highlands Regional Council area - including Springsure, Rolleston, Emerald, Capella, Duaringa, Gem Fields, May Downs
CLIENT: Central Highlands Regional Council
COMMENCEMENT DATE: January 2019
COMPLETION DATE: August 2019
Princess Highway Berry to Bomaderry Upgrades
DESCRIPTION: This upgrade road works project, working with the Downer Seymour Whyte Joint Venture will see 10.5 kilometres of four-lane highway constructed between Mullers Lane, Berry and Cambewarra Road, Bomaderry, in addition to the building of temporary roads and carrying out road work for the safety of motorists and workers. Essjay Contracting is supplying wet hire of final trim graders and water carts to this project.
LOCATION: Berry, NSW
CLIENT: Downer Seymour Whyte Joint Venture
INDICATIVE VALUE OF WORKS: $240 million
COMMENCEMENT DATE: May 2018
COMPLETION DATE: Late 2021
LOCATION: Berry, NSW
CLIENT: Downer Seymour Whyte Joint Venture
INDICATIVE VALUE OF WORKS: $240 million
COMMENCEMENT DATE: May 2018
COMPLETION DATE: Late 2021
Mackay Ring Road Stage 1
DESCRIPTION: Stage 1 is an 11.3 km ring road route which will connect the Bruce Highway at the Stockroute Road roundabout in the south of Mackay, Queensland through to Bald Hill Road in the north. Benefits: Stage 1 will: - improve safety and road network connectivity - reduce travel time by avoiding 10 signalised intersections - increase freight efficiencies - remove heavy vehicle traffic from Nebo Road - introduce a new river crossing over the Pioneer River - have speed limits of 80km/h and 100km/h (compared to a 60km/h urban network) - pave the way for the first 2.6 km of the Walkerston Bypass.
LOCATION: Mackay, QLD
CLIENT: EnProCon (CPB Contractors)
INDICATIVE VALUE OF WORKS: $497.3 million
COMMENCEMENT DATE: October 2017
COMPLETION DATE: 2020
LOCATION: Mackay, QLD
CLIENT: EnProCon (CPB Contractors)
INDICATIVE VALUE OF WORKS: $497.3 million
COMMENCEMENT DATE: October 2017
COMPLETION DATE: 2020
Eton Range Peak Downs Highway Realignment Project
DESCRIPTION: The road construction project involves widening the Highway from 2 to 4 lanes, a partial realignment of the existing Range crossing, a split carriageway to separate traffic and reduction in grade. To widen part of the existing Range road, a reinforced earth embankment is being constructed which will be 780 metres long and 45 metres tall at its highest point.
LOCATION: Eton Range, Peack Downs Highway, QLD
CLIENT: Fulton Hogan (DTMR)
INDICATIVE VALUE OF WORKS: $189 million
COMMENCEMENT DATE: April 2016
COMPLETION DATE: June 2019
LOCATION: Eton Range, Peack Downs Highway, QLD
CLIENT: Fulton Hogan (DTMR)
INDICATIVE VALUE OF WORKS: $189 million
COMMENCEMENT DATE: April 2016
COMPLETION DATE: June 2019
Neerkol Creek Rock-Lining
DESCRIPTION: Lining the east and western banks under the reconstructed Neerkol Creek Bridge (the original being destroyed by Cyclone Marcia) in order to prevent future water damage to the road and rail network in the area.
LOCATION: Neerkol Creek, Stanwell QLD
CLIENT: RoadTek (DTMR)
COMMENCEMENT DATE: May 2017
COMPLETION DATE: August 2017
LOCATION: Neerkol Creek, Stanwell QLD
CLIENT: RoadTek (DTMR)
COMMENCEMENT DATE: May 2017
COMPLETION DATE: August 2017
Peak Downs Highway Timber Bridge Replacement Project
DESCRIPTION: This project involves the construction of 4 new concrete bridges and all associated road works (Pavements, Drainage, surfacing), to replace 4 timber bridges on the Peak Downs highway, west of Mackay. The bridges are located at Boundary Creek, Cut Creek, Lonely Creek and Fiery Creek. Subcontracting to Seymour Whyte Constructions and providing their entire fleet of plant, including final trim graders, final trim excavators, water trucks, truck and dogs, and various other items of plant.
LOCATION: Peak Downs Highway (Between Nebo and Mackay)
CLIENT: Seymour Whyte Constructions (PC DTMR)
INDICATIVE VALUE OF WORKS: $50 million
COMMENCEMENT DATE: August 2016
COMPLETION DATE: December 2017
LOCATION: Peak Downs Highway (Between Nebo and Mackay)
CLIENT: Seymour Whyte Constructions (PC DTMR)
INDICATIVE VALUE OF WORKS: $50 million
COMMENCEMENT DATE: August 2016
COMPLETION DATE: December 2017
Resources Projects
Aquila Mine Long Wall Project
Description: This project, jointly funded by both Anglo American and Mitsui Coal Holdings, entails the construction of a single long wall underground mine and supporting infrastructure. The operation will target two seams, the Aquila and Aquila Lower coal seams. The depth of the aquila seams from the surface varies from approximately 70 meters up to 280 meters with a nominal seam height ranging from 1.8 metres to 2.2 metres. The longwall will be supported by two miner development units with ROM coal transferred from the underground development and longwall mining units via a new under ground conveyor belt system to a new surface conveyor and onto an expanded ROM stockpile.
Location: Middlemount, QLD
Client: SEE Civil & Anglo American
Indicative Value of works: $319.11 million
Commencement Date: September 2019
Completion Date: July 2021
Location: Middlemount, QLD
Client: SEE Civil & Anglo American
Indicative Value of works: $319.11 million
Commencement Date: September 2019
Completion Date: July 2021
Adani Abbott Point Coal Terminal
DESCRIPTION: Abbot Point is the most northerly deepwater coal port of Australia, situated approximately 25 kilometres north-west of the township of Bowen, Queensland. Established in 1984, it consists of a rail in-loading facility, coal handling and stockpile areas, and a single trestle jetty and conveyor connected to a berth and shiploader, located 2.75 km off-shore. Coal reaches the port via the GAP railway line from the Bowen Basin Coalfields. The port is planned to provide export facilities for coal mined from the Galilee Basin. The terminal is being expanded with the addition of a second wharf and shiploader as well as an additional onshore stockyard and machines. Once completed it will be the largest coal port in the world.
LOCATION: Bowen, Queensland
CLIENT: Aestec Services
COMMENCEMENT DATE: 2018
COMPLETION DATE: 2019
LOCATION: Bowen, Queensland
CLIENT: Aestec Services
COMMENCEMENT DATE: 2018
COMPLETION DATE: 2019